Packet.School
HomeLevelsSandboxFreeAbout
XP0
Sandbox·Network Challenge

Phase 5 · Challenge

Network Challenge

Five missions on the isometric board: build topologies under port and cable constraints, earn stars.

Mission 01

The office LAN

Two PCs sit on the same network but nothing connects them. Wire both through a switch so frames can flow.

Field note

Hosts have a single NIC. Place the switch between them: Host A — Switch — Host B.

Rack (inventory)
Mission board2 devices · 0 cables
Host A192.168.1.10Host B192.168.1.11
Goals
  • Host A reaches Host B
  • Route passes through a switch
Rating
  • All tests pass
  • No idle hardware
  • At most 2 cables
Packet.School

An open, interactive curriculum for computer networking.

v3.0 · MIT22 lessons live

Learn

  • Lessons
  • Sandbox
  • Levels
  • Free
  • About

Simulations

  • Packet Journey
  • DNS Lookup
  • DHCP Simulator
  • Subnet Calc
  • Network Builder
  • Terminal

Project

  • About
  • Changelog
  • GitHub
  • Contributing
  • Style guide

Newsletter

One short email when a new level ships. No tracking pixels.

© 2026 Packet.School — MIT licensedSupport with a coffeebuilt in the open